Lane Vertical activity

An activity that adds a top-to-bottom swimlane to a process model.


Lane Vertical activity

Configure the Lane Vertical activity

To configure the Lane Vertical activity, do the procedure in this topic.

Good to Know

  • The pool activities represent a group of swimlanes. First, add the pool activity to the process. To add swimlanes to the pool, drag lane activities onto the pool activity.

    For example, first add a Pool Horizontal activity to the process, and then drag Lane Horizontal activity onto the pool.

  • This section shows the configuration settings on the configuration screens for this activity. Other configuration settings apply to system activities. For more information, refer to:

How to Start

  1. Open Process Builder.

    For information about how to open this screen, refer to Process Builder.


    Open Process Builder
  2. In Process Builder, in the Activity Library, open the Swimlanes tab.

    Open Swimlanes tab
  3. On the Swimlanes tab, drag the Pool Vertical activity onto your process.

    Drag Pool Vertical activity Ref
  4. On the Swimlanes tab, drag the Lane Vertical activity onto the Pool Vertical activity.

    Drag Lane Vertical activity

Procedure

  1. (Optional) Click the Lane Vertical activity, and enter text for your heading.