Load per day is the number of list items that can be created per day (24
hrs).
The results are based on a test conducted for one hour creating a proportional
number of list items. For example, in the first test, for a 5K load the results are
based on one hour and ~200 list items. Time is measured for creating each list item,
and the average is calculated.